• Heavy metal wastewater - Inner Mongolia Chromium Co., Ltd. Sewage Treatment Project
  •  

     

    Treatment Indicators

    ●Wastewater sources
    The discharged wastewater consists of three parts: wastewater produced by chromium production line, wastewater discharged by the power plant, and domestic sewage of the whole plant.
    ●Major pollutants
    The major pollutants in chromium-containing wastewater include hexavalent chromium, as well as COD, BOD5, SS, sulfide, ammonia nitrogen, etc.
    ●Treatment scale
    1000m3/d, the daily run time is 24h, and the average design treatment capacity is 42m3/h.
    ●Effluent water standards
    Implement the “Code for Design of Wastewater Reclamation and Reuse” (GB50335-2002). The reclaimed water is used as make-up water for the circulating cooling system.

     