Guizhou Guiyang Huaxi Sewage Treatment Plant Sewage Control System
Construction Content: Replacement of failed instruments, replacement of PLC, repair of line faults, repair of mimic panel, rewrite of configuration program and PLC program and other technology upgrades.
Construction Effect: restore normal and stable operation of the system, and meet the operation and management requirements of the local environmental authority and sewage treatment plant.